Preliminary pact for Plus and Play
Irish altnet Magnet Networks says it has upgraded its fibre-optic
broadband services, upping the entry level of its basic downstream
connection from 5Mbps to 30Mbps, while increasing minimum upload speeds to 5Mbps from 1Mbps. The operator’s new minimum
standards will also apply to its
existing 5Mbps and 10Mbps plans, it added
[More]
Tags: